Runbang heavy machine 2 container bridge cranes shipped smoothly
On November 8, 2011, at the busy Taicang Port assembly site, the two container bridge cranes built by Runbang Heavy Machinery passed the Runbang Heavy Machinery project installation team for more than three months. It is reported that the two container cranes shipped this time will be transported by sea to the customer site and the final assembly and commissioning will be completed.
In recent years, through cooperation with internationally renowned port machinery supplier Kalmar, Runbang Heavy Machinery has accumulated rich experience in production, manufacturing and final assembly of large-scale port equipment. The container bridge has a lifting capacity of 65 tons, an outreach distance of 61 meters, and a lifting height of 41 meters on the rail. On the basis of good overall performance and convenient loading and unloading, the secondary brake on the driving mechanism of the cart is added. The system uses multi-drive control to achieve energy feedback. The overall performance of the container bridge crane is good, and it has advantages over traditional bridge cranes in terms of environmental protection, noise resistance, automation, yard utilization and handling capacity.

Syntheses Material Intermediate

CAS NO: 608-08-2,Molecular Formula: C10H9NO2,CAS NO. 933-20-0,Molecular Formula: C3H2Cl2N4,CAS NO: 1912-43-2,Molecular Formula: C11H11NO2,Molecular Formula: C11H12N2O,CAS NO: 4578-58-9,CAS NO: 368-39-8,Molecular formula: C6H15BF4O

Chemtarget Technologies Co., Ltd. , https://www.dgtbcb.com